
About Us
Radio signal coverage surveys are required to evaluate the in-building signal levels for both the initial evaluation as well as for final test and acceptance of a BDA system. A RTS NICET and FCC certified technician will be available to assist you with the survey and will follow up with the survey report. Our reports are done in accordance with PCTEL IBflex platforms.
Our services

Pre-Construction
RTS helps identify ERCES requirements early, coordinates with the proper AHJ and agencies, delivers feedback designed for a successful project.

Baseline Project Assessment
One common mistake we see is waiting until the building is near completion before evaluating emergency responder radio coverage.

Annual Testing and Surveys
Annual testing and in-building signal surveys are required by the State of South Carolina fire code.
South Carolina
Fire Life Safety and ERRCS BDA.

South Carolina Fire Code
Emergency responder communication coverage for emergency responders shall be provided in all new buildings.
Our ERCES services include:
- ERRCS system pre design surveys
- Emergency radio coverage testing
- Signal strength surveys
- AHJ coordination
- Permit and submittal assistance
- Donor antenna placement
- Final certification support
- System maintenance and inspections



PO Box 31177
Greenville, SC 29608
1-864-365-4972
service.rts@outlook.com